Beading… check!

Barry’s got the beading fitted in the living room.  We think we’re going to just paint the skirting boards in the kitchen, and then maybe seal them, rather than fitting beading, as we’ve put the skirts back on over the flooring (whereas in the living room, they’ve had to go up to the edges).

 

He started by trying to stick them with adhesive, but our walls fool you into thinking that they’re straight.  They’re not.  He’s hammered little tacks in now so that they’re more snug against the skirting boards.

We’ve also brought all of our DVDs and CDs back into the living room.  After having the units empty for so long (since January!), it’s a shock to the eyeballs, and I’m not sure I like it!

We do still need to buy the bits (cupboards/drawers/baskets) for the unit, so that may help the eyeball issue.

Wardrobes

After all I said I was going to get from my mum’s, we’ve decided not to have the wardrobes in the end.  I think it’s overfacing Barry, who seems to have reached his limit on DIY for the year and is staging some kind of protest.

We really need to get cracking again – at least to finish off the last bits of the kitchen and living room, but going on holiday and eating out (almost) every night isn’t really conducive to pockets full of money to spend on picture frames.

Of our kitchen jobs still to do, we have the following left…

1. Sand and repaint the ceiling

2. Cut skirting boards to size and repaint

3. Fit skirting boards

4. Finish painting the kitchen walls

5. Finish sanding and fit the peninsula

6. Tile the kitchen walls

7. Paint the stairs wall, handrail and ceiling

8. Replace all of the switches with brushed silver ones

9. Get a condenser tumble dryer

The living room list’s not much better…

1. Sand and repaint wall and paint skirting boards

2. Paint the skirting boards and cut and fit the beading

3. Paint the kitchen/living room door (both sides) and the doorframe on the other side

4. Paint a radiator

5. And another one

6. Fit the strip thing between the kitchen and living room

7. Create the photo wall – finalise photos and buy frames and prints

8. Buy white drawers and baskets for the units

 

I need a lie down.

Depressing visual representation of all the jobs left to do: the living room

In the second of this two-part mini-series, I take a closer look at the living room, and all the things we still need to do.  Click here for yesterday’s gripping instalment.

1. Sand and repaint wall and paint skirting boards

2. Paint these skirting boards and cut and fit the beading

3. Paint this door (both sides) and the doorframe on the other side

4. Paint this radiator

5. And this one

6. Fit the strip thing between the kitchen and living room

7. Create the photo wall – finalise photos and buy frames and prints

8. Buy white drawers and baskets for the units

Depressing visual representation of all the jobs left to do: the kitchen

This is part one of a two-part mini-series whereby I put all the work we’ve already done into perspective and think about just how much more time and money we still need to dedicate to these two rooms of the house that are taking over all of our free time and finances. This is part one: the kitchen. Tune in tomorrow for an exciting look at the long list of tasks still to do in the living room.

1. Sand and repaint the ceiling

2. Cut skirting boards to size and repaint

3. Fit skirting boards

4. Finish painting the kitchen walls

5. Finish sanding and fit the peninsula

6. Tile the kitchen walls

7. Paint the stairs wall, handrail and ceiling

8. Replace all of the switches with brushed silver ones

9. Get a condenser tumble dryer